• Home
  • Submit Paper
  • Check Paper Status
  • Download Certificate/Paper
  • FAQs
  • Contact Us
Email: ijraset@gmail.com
IJRASET Logo
Journal Statistics & Approval Details
Recent Published Paper
Our Author's Feedback
 •  ISRA Impact Factor 7.894       •  SJIF Impact Factor: 7.538       •  Hard Copy of Certificates to All Authors       •  DOI by Crossref for all Published Papers       •  Soft Copy of Certificates- Within 04 Hours       •  Authors helpline No: +91-8813907089(Whatsapp)       •  No Publication Fee for Paper Submission       •  Hard Copy of Certificates to all Authors       •  UGC Approved Journal: IJRASET- Click here to Check     
  • About Us
    • About Us
    • Aim & Scope
  • Editorial Board
  • Impact Factor
  • Call For Papers
    • Submit Paper Online
    • Current Issue
    • Special Issue
  • For Authors
    • Instructions for Authors
    • Submit Paper
    • Download Certificates
    • Check Paper Status
    • Paper Format
    • Copyright Form
    • Membership
    • Peer Review
  • Past Issue
    • Monthly Issue
    • Special Issue
  • Pay Fee
    • Indian Authors
    • International Authors
  • Topics
ISSN: 2321-9653
Estd : 2013
IJRASET - Logo
  • Home
  • About Us
    • About Us
    • Aim & Scope
  • Editorial Board
  • Impact Factor
  • Call For Papers
    • Submit Paper Online
    • Current Issue
    • Special Issue
  • For Authors
    • Instructions for Authors
    • Submit Paper
    • Download Certificates
    • Check Paper Status
    • Paper Format
    • Copyright Form
    • Membership
    • Peer Review
  • Past Issue
    • Monthly Issue
    • Special Issue
  • Pay Fee
    • Indian Authors
    • International Authors
  • Topics

Ijraset Journal For Research in Applied Science and Engineering Technology

  • Home / Ijraset
  • On This Page
  • Abstract
  • Introduction
  • Conclusion
  • References
  • Copyright

Analysis and Providing Solutions for the Rectification of Black Spots On NH-27(OLD NH-28)

Authors: Vishal Pandey, Harivansh Kumar Chaudhary, Akash Malik

DOI Link: https://doi.org/10.22214/ijraset.2022.47002

Certificate: View Certificate

Abstract

This study primarily based totally on the road safety and specified observe of black spot. National highways represent a considerable percentage of these accidents, especially during the massive economic loss and exaggerates the development of the country. Basically the main aim of this paper is to Identify the black spot and more elaborated study for Analysis of Black Spots and its Rectification on the basis of traffic survey i.e. by Turning Movement Count survey. This study includes different approaches and methods that are used for Selection of particular study stretch i.e. NH-27, firstly collection of accident data and then we split down the data for better observation for the analysis of black spot also we throw light on the causes which are responsible for accident on the basis of ASI (Accident severity index). Also, it consists of a few strategies which might be used to profile those accident places and the usage of earlier than and after research to estimate the impact of remedy at the Black spots or dark spot on highway. This paper concludes the rectification methodology based on short term measurements, long term measurements, mitigation measures or geometric design improvement which depend on existing road conditions

Introduction

I. INTRODUCTION & LITERATURE REVIEW

India is in a race of developing country and increase in road network in India growing rapidly. According to the India’s Basic Road Statistics, India has the second largest road network in the world. The alarming increase in road accidents is one of India's least well-kept secrets. The number of serious and minor injuries, human suffering and economic damage from accidents is inestimable. Road safety is therefore a major concern in the current situation. According to traffic accident data released in 2019 by the Ministry of Road and Motorway Transport, a total of 449,002 accidents occurred in the country in the 2019 calendar year, with 151,113 fatalities and 451,361 injuries. This analysis shows that approx. 1,374 accidents i.e. 377 deaths occur every day. These disturbing statistics only shows the lack of appropriate road safety measures in the country. As per Ministry of Road Transport and Highway (MORTH) the Road Accident Black Spot is a stretch of National Highway in which 10 fatalities took place the last 3 calendar years or 5 road accidents at 500m distance (including fatalities/grievous injuries in totally 3 years) took place during the last 3 calendar years. To provide the solutions for reducing the severity or we can say removal of any black spot is very much needed therefore in order to understand the characteristics and the volume of traffic at any particular black spot on highway road network it is important to conduct a traffic survey at that particular black spot (Here we are using Turning Movement Count Survey) because reduction of black spot from highway is one of the maximum essential problems concerning lack of life. The selected project Study Area is stretches of National Highways of Mehsi- Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) of NH-27 (old NH- 28) in the State of Bihar Therefore, the fundamental intention of the task is to providing measures for the rectification of Black spots identified on NH-27. After Studying, Examining & Analyzing Black spots we can be rectify and decrease appreciably after implementation of quick time period measures. Nikhil Katre, N. H. Pitale, Shrikant Bobade (2019) aimed at the rectification of different black spots on the basis of short term, long term, mitigation measure or improvement of geometric design required as per existing road condition [1]. Athira Mohan Dr. V.S. Landge (2017)) aim to identify the Black Spot location along Amravati to Nagpur road stretch on Asian Highway 46 on the basis of Weighted Severity Index [2]. R.R. Sorate1, R.P. Kulkarni2, S.U. Bobade3, M.S. Patil4, A.M. Talathi4, I.Y. Sayyad4, S.V. Apte4(2015) hinted at various methods adopted to identify the causes of accidents also to identify the Black Spot on National Highway 4 [3]. Arnav Duarah, Abinash Kashyap, Kapil Katuwal, Manoj Kumar Sarma, Sushmita Borah, Raj Chakrabarty (2017) aim to identify Black Spot on NH-27 by comparing 3 different methods i.e. accident rate, accident frequency & Weighted Severity Index [4]. LIU Yichao (2013) aimed at prevention of accident black spots by deep study on different influence factors responsible for accident Black Spot formation on National Highways [5]. After analyzing the different studies and researches we came to know about the methods and different solutions for the rectification of black spots now in this study we are using it for rectification of different black spots pre-identified on study stretch.

This study methodology includes the process of providing the solution for the rectification of some particular black spots chosen from the list of black spots identified on the study stretch.

  1. In this study the selected study stretch is located in state of Bihar, India i.e. From Kotwa to Muzzafarpur which is approx. 81.2 Km on NH-27 (old NH-28)
  2. Study stretch as per chainage allotted by NHAI (National Highway Authority of India) is National Highways of Mehsi- Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) of NH-27 (old NH- 28) in the State of Bihar.
  3. Previous 3-year road accident data was collected from the respective police stations for the rectification of Black spots.
  4. Bifurcation of Road accident data as per the type of injury (i.e. Fatal, Grievous or Minor) or sometimes Nature of accident.
  5. As per the bifurcated data of police station accident record, we pick some spots out of different existing black spots according to the maximum accident occurring on selected stretch for conducting the analysis of black spots for further rectification solutions.
  6. Selected spots then get analyzed by the ASI (Accident Severity Index) to priorities the black spots identified according to importance of solution required.
  7. For the detailed analysis of selected black spots, we conduct Traffic survey (Here we are using Turning Movement Count Survey).
  8. Through TMC Survey we can understand the volume of traffic and type of vehicle using that particular black spot on that study stretch corridor.
  9. We can choose the solutions for the rectification on selected black spots on our study stretch through detailed study of ASI (Accident severity index) and TMC (Turning Movement Count) data.
  10. Providing proper safety measures for the rectification of black spot.
  11. At last reduction in number of accident took place after the implementation of rectification solution for the selected black spots.

III. STUDY AREA

Study area selected stretch of National Highway of Mehsi- Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) of NH-27 (old NH- 28) in the State of Bihar, India taken by google earth.

Primarily data of existing black spots on NH-27 get collected from MORTH & NHAI.

TABLE II
Black Spot Locations On NH-27

Sr. No.

Police station included

Black Spot Location identified by MORTH & NHAI on NH-27

Chainage as per NHAI

1

Chakia Police station

Banjhula Chowk

470.05

2

Chakia Police station

Baragi Bazaar Market Area

487.65

3

Motipur Police station

Kali Mandir Motipur

492.80

4

Motipur Police station

Pansalwa Chowk Market Area

497.40

5

Motipur Police station

Narriyar Area

499.30

6

Meenapur Police station

Kharika Chawk

503.52

7

Kanti Thermal Police station

Chinmastika Mandir

508.87

8

Kanti Thermal Police station

Near Kanti Thermal

509.58

9

Kanti Thermal Police station

Near Netaji Chowk

510.60

IV. STATISTICAL ANALYSIS AND OBSERVATIONS

Police station accident data (Bifurcated) record of previous 3 years for the analysis.

TABLE IIII
Police Station Accident Data

BIFURCATED POLICE STATION ACCIDENT DATA OF 3 YEARS

Location

2017

2018

2019

Fatal

Grievous

Injured

Fatal

Grievous

Injured

Fatal

Grievous

Injured

M

F

M

F

M

F

M

F

M

F

M

F

M

F

M

F

M

F

1

3

2

4

2

2

0

2

4

2

1

3

2

4

3

4

4

5

1

2

5

2

1

0

1

0

6

1

3

1

4

1

1

2

2

2

2

3

3

9

4

6

8

1

2

4

6

4

6

7

4

7

4

8

8

4

5

4

2

1

3

4

5

1

3

4

2

1

2

2

2

2

6

5

3

1

5

6

8

8

4

3

2

9

8

6

3

6

3

4

6

10

9

6

1

6

4

6

7

2

1

0

2

3

4

4

4

3

5

1

8

5

7

2

7

8

6

11

5

6

1

9

6

8

7

3

2

6

7

5

6

8

3

8

4

3

2

3

2

1

1

4

4

5

3

4

2

2

2

6

2

2

9

4

2

2

4

1

1

2

1

6

7

2

3

5

3

1

4

4

1

Total

45

44

22

38

39

34

36

46

41

Where,  M= Male

              F= Female

Based on police station accident data record for the analysis of black spots Accident Severity Index (ASI) value was calculated. ASI is that value which indicates the hazardous of any location, following equation has been used for the ASI chart:

ASI         =             [(Nf*Wf) +(Ng*Wg) +(Ni*Wi)]                    ………. (1)

Where, 

Nf           -              No. of fatal accidents occur in last 3 years

Wf          -              Weight assign to fatal accident (here we use 6)

Ng          -              No. of grievous accidents occur in last 3 years

Wg         -              Weight assign to grievous accident (here we use 3)

Ni           -              No. of injured accident occur in last 3 years

Wi          -              Weight assign to Injured accident (here we use 1)

TABLE VII
ASI Value as Per Equation 1

Accident Severity Index of Black Spots on NH- 27

Location

Accident Severity Index

Banjhula Chowk

94

Baragi Bazaar Market Area

97

Kali Mandir Motipur

186

Pansalwa Chowk Market Area

85

Narriyar Area

201

Kharika Chawk

135

Chinmastika Mandir

227

Near Kanti Thermal

73

Near Netaji Chowk

100

Based on ASI values the highest valued black spots further be taken for the rectification solution analysis i.e. Kali Mandir Motipur, Narriyar area & Chinmastika Mandir.

A. For the selected black spots, we will do traffic survey for addressing various objectives and issues pertaining rectification of blackspot.

B. Here we are using Turning Movement Count Survey in order to understand the characteristics and the volume of traffic using the project road stretch, data on existing road network, traffic volume on the project road were collected through this traffic survey.

  1. Turning Movement Count Survey Analysis

Kali Mandir Motipur at chainage 492.80

The intersection peak hour traffic (in number and in PCU) of Kali Mandir Motipur has been shown in table IV.

TABLE VIIV

Peak Hour

Direction

Total Motorised Vehicles

Total Non-motorised Vehicles

Total Motorised +
Non-Motorised Vehicles

Code

Description

     

From

To

   

No.

PCU

No.

PCU

No.

PCU

10

11

1A

Minor Road to Kotwa

127

101

30

15

157

116

1B

Muzaffarpur to Kotwa

587

707

6

3

593

710

2A

Minor Road to Muzaffarpur

60

45

14

7

74

52

2B

Muzzafarpur to Minor road

66

71

5

3

71

74

1C

Kotwa to Muzaffarpur

338

344

1

1

339

344

2C

Kotwa to Minor road

28

29

3

2

31

31

Total Peak Hour Data

1265

1325

2. Observation & Proposed Solution

a. It has been observed that parked trucks causing congestion to the vehicles on right side of carriage way while driving into the minor lane.

b. There has been a disorientation in channelizing island diverting traffic to wrong side at channelizing area at the median opening.

c. A VUP with span of 12.0m with vertical clearance of 5.5m.

d. Provision of a Truck-lay bay with 20 truck parking capacity.

e. Provision of intermediate lane, service road on both side of main carriageway.

f. Development of Entry/Exit at the start/end of service road.

g. Provision of signage as per IRC:67-2012.

h. Provision of Lane marking as per IRC:35-2015.

 

Narriyar area at chainage 499.30

The intersection peak hour traffic (in number and in PCU) of Narriyar area has been shown in table V.

TABLE V

Peak Hour

Direction

Total Motorised Vehicles

Total Non-motorised Vehicles

Total Motorised +
Non-Motorised Vehicles

Code

Description

     

From

To

   

No.

PCU

No.

PCU

No.

PCU

17

18

1A

Minor Road to Kotwa

22

14

3

2

25

15

1B

Muzaffarpur to Kotwa

470

735

26

13

496

748

2A

Minor Road to Muzaffarpur

21

12

1

1

22

13

2B

Muzzafarpur to Minor road

25

19

12

6

37

25

1C

Kotwa to Muzaffarpur

171

212

4

2

175

214

2C

Kotwa to Minor road

13

14

6

3

19

17

Total Peak Hour Data

774

1031

3. Observation & Proposed Solution

a. It has been observed that parked trucks causing congestion to the vehicles on right side of carriage way while driving into the minor lane.

b. There has been a disorientation in channelizing island diverting traffic to wrong side at channelizing area at the median opening.

c. A VUP with span of 12.0m with vertical clearance of 5.5m.

d. Provision of a Truck-lay bay with 20 truck parking capacity.

e. Provision of intermediate lane, service road on both side of main carriageway.

f. Development of Entry/Exit at the start/end of service road.

g. Provision of signage as per IRC:67-2012.

h. Provision of Lane marking as per IRC:35-2015.

 

4. Chinmastika mandir at chainage 508.87

The intersection peak hour traffic (in number and in PCU) of Chinmastika Mandir has been shown in table VI.

TABLE VI

Peak Hour

Direction

Total Motorised Vehicles

Total Non-motorised Vehicles

Total Motorised +
Non-Motorised Vehicles

Code

Description

From

To

   

No.

PCU

No.

PCU

No.

PCU

16

17

1W

Temple  to Muzaffarpur

2

1

4

2

6

3

1B

Kotwa  to muzzafarpur

574

686

0

0

574

686

2W

Kotwa to Temple

1

1

0

0

1

1

2B

Kotwa to Muzaffarpur

574

686

3

2

577

688

1C

Muzaffarpur to Kotwa

398

459

1

1

399

460

2C

Muzaffarpur to Kotwa

398

459

1

1

399

460

Total Peak Hour Data

1956

2296

5. Observation & Proposed Solution

a. It is observed that median opening is placed 100m away from the temple, forcing vehicle users to take wrong route to the temple.

b. It is observed that there is on-street parking available for the temple.

c. A LVUP with span of 7.0m with vertical clearance of 4.0m.

d. Provision of a Truck-lay bay with 20 truck parking capacity.

e. Provision of intermediate lane, service road on both side of main carriageway.

f. Development of Entry/Exit at the start/end of service road.

g. Provision of signage as per IRC:67-2012.

h. Provision of Lane marking as per IRC:35-2015.

Conclusion

From the project stretch it\'s been observed that providing the solutions for the rectification of black spots, the intention does now no longer best determine what assets are wanted however additionally have an effect on which quick time period measures must be applied, since rectification of Black Spot is endless process or we can say it’s a continuous process due to variety of different reasons for any on road accidents and every Black spot require some other kind of analysis to solve the problem and here in this study we choose Accident Severity Index (ASI) and Turning Movement Count (TMC) method to provide the solutions for rectification of different pre-existing which are concluded as follows: 1) Basic aim of this project is to provide the solution for the rectification of different identified black spots with the use of traffic survey method on NH-27 (old NH-28). 2) In this study we are using existing police station accident data record to understand the severity rate of different black spots identified by Ministry of Road Transport and Highway Also National Highway Authority of India. 3) On the basis of ASI (Accident Severity Index) we came to know that from the given list of black spots few of them appeared to be most hazardous as compared to others and need to be rectified on priority basis. 4) Solution for rectification has been given at the end of the analysis of data as long term measure for black spots also for safer use of intersections. 5) In last black spots will be rectify after the implementation of safety measures on NH-27.

References

[1] Katre, N., Pitale, N. H., & Bobade, S. (2019) Analysis of Black Spots on NH-3 and Its Rectification. Journal of Transportation Systems, 4(2). [2] Mohan, A., & Landge, V. S. (2017). Identification of accident black spots on national highway. Int. J. Civ. Eng. Technol, 8(4), 588-596. [3] Sorate, R. R., Kulkarni, R. P., Bobade, S. U., Patil, M. S., Talathi, A. M., Sayyad, I. Y., & Apte, S. V. (2015). Identification of accident black spots on national highway 4 (New Katraj tunnel to Chandani chowk). IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 12(3), 61-67. [4] Duarah, A., Kashyap, A., Katuwal, K., Sarma, M. K., Borah, S., & Chakrabarty, R. (2017) Determination of Blackspot on National Highway-37 (New NH-27), Assam. [5] Liu, Y. (2013). Highway traffic accident black spot analysis of influencing factors. In ICTE 2013: Safety, Speediness, Intelligence, Low-Carbon, Innovation (pp. 2295-2300). [6] Roess, R. P., Prassas, E. S., & McShane, W. R. (2004). Traffic engineering. Pearson/Prentice Hall. [7] Elena, K., Sergei, E., & Jaros?aw, R. (2020). Potential for improving the procedure of inspecting road traffic accident black spots. Architecture and Engineering, 5(3), 56-62. [8] Dereli, M. A., & Erdogan, S. (2017). A new model for determining the traffic accident black spots using GIS-aided spatial statistical methods. Transportation Research Part A: Policy and Practice, 103, 106-117. [9] Elena, K., Sergei, E., & Grigory, G. (2020). Systemic indicators of road infrastructure at accident clusters. Architecture and Engineering, 5(1). [10] Shad, R., & Rahimi, S. (2017). Identification of road crash black-sites using geographical information system. International Journal for Traffic and Transport Engineering,7(3),368-380.

Copyright

Copyright © 2022 Vishal Pandey, Harivansh Kumar Chaudhary, Akash Malik. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

ijraset47002

Download Paper

Authors : Vishal Pandey

Paper Id : IJRASET47002

Publish Date : 2022-10-07

ISSN : 2321-9653

Publisher Name : IJRASET

DOI Link : Click Here

About Us

International Journal for Research in Applied Science and Engineering Technology (IJRASET) is an international peer reviewed, online journal published for the enhancement of research in various disciplines of Applied Science & Engineering Technologies.

Quick links
  • Privacy Policy
  • Refund & Cancellation Policy
  • Shipping Policy
  • Terms & Conditions
Quick links
  • Home
  • About us
  • Editorial Board
  • Impact Factor
  • Submit Paper
  • Current Issue
  • Special Issue
  • Pay Fee
  • Topics
Journals for publication of research paper | Research paper publishers | Paper publication sites | Best journal to publish research paper | Research paper publication sites | Journals for paper publication | Best international journal for paper publication | Best journals to publish papers in India | Journal paper publishing sites | International journal to publish research paper | Online paper publishing journal

© 2022, International Journal for Research in Applied Science and Engineering Technology All rights reserved. | Designed by EVG Software Solutions