Rapid urbanization and the increasing demand for affordable housing have compelled the global construction sector to shift from conventional masonry and formwork practices toward faster and more industrialized construction methodologies. This review paper presents a comprehensive evaluation of Mivan technology, an advanced aluminium formwork system developed for the construction of monolithic reinforced-concrete structures. By synthesizing findings from academic literature and industry case studies, this study examines the structural, economic, and operational implications of transitioning from conventional timber or steel formwork to modular aluminium formwork systems. The analysis indicates that Mivan construction can significantly reduce project durations, while providing superior dimensional accuracy and a high-quality concrete surface finish.
The resulting finish can substantially reduce or eliminate the requirement for conventional external plastering, thereby lowering labour requirements and associated construction costs. Furthermore, the monolithic integration of reinforced-concrete walls and slabs improves structural continuity and can provide enhanced resistance to lateral and seismic forces when appropriately designed and detailed. The system also offers advantages in terms of reduced construction joints and improved water-tightness, making it particularly suitable for high-rise and mid-rise residential buildings where repetitive floor layouts and rapid construction are required.
Introduction
The text provides an overview of Mivan aluminium formwork technology and reviews research comparing it with conventional formwork. Mivan is a lightweight, modular aluminium formwork system used mainly for rapid, repetitive, and monolithic reinforced-concrete construction, particularly in mass housing and high-rise buildings.
Main points
Purpose of Mivan technology:
Mivan was developed to speed up construction by using reusable aluminium panels to cast walls, slabs, beams, and other structural components, often as an integrated or monolithic system.
Need for the technology:
Rapid urbanization, population growth, housing demand, limited land, and the need for shorter construction schedules have increased the importance of industrialized construction methods.
Advantages identified in the literature:
Faster construction and shorter project duration.
Higher labour productivity and reduced repetitive labour requirements.
Better dimensional accuracy and consistent concrete quality.
Reusable and lightweight formwork panels.
Reduced need for plastering and finishing in some applications.
Monolithic construction, providing good structural continuity.
Suitability for mass housing and repetitive building layouts.
Potentially improved performance under seismic and lateral loads.
Greater efficiency for high-rise and large-scale projects.
Cost considerations:
Several studies indicate that Mivan can have a higher initial cost than conventional formwork because of the specialized aluminium panels and associated investment. However, repeated reuse, reduced labour, faster construction, and lower finishing/maintenance requirements can make it economically advantageous over the long term, especially for large repetitive projects.
Structural performance:
Multiple studies using software such as ETABS investigated Mivan buildings under earthquake and wind loading. The reviewed research generally reports good lateral stiffness, reduced displacement and storey drift in several configurations, and competitive or better seismic performance compared with conventional RC structures. Building shape, height, wall openings, seismic zone, and soil conditions significantly influence performance.
Productivity:
Research consistently emphasizes that Mivan improves productivity because panels can be rapidly assembled, aligned, concreted, dismantled, and reused. This makes the system particularly effective when many similar floors or housing units must be constructed.
Conclusion
Based on the findings reported in the reviewed literature, Mivan construction generally provides higher construction productivity, improved dimensional accuracy, consistent concrete surface quality, and reduced labour requirements compared with conventional formwork systems. From an economic perspective, most studies show that the initial investment and formwork cost of Mivan systems can be higher than conventional formwork. However, this additional initial cost can potentially be offset by shorter construction schedules, repeated reuse of formwork, reduced labour requirements, lower finishing requirements, and earlier project completion while several researchers have highlighted that Mivan buildings, which generally behave as reinforced-concrete wall or shear-wall systems, possess considerable lateral stiffness and structural continuity. Consequently, Mivan technology should not be considered a universal replacement for conventional construction. Proper structural modelling and design using appropriate load combinations and relevant Indian Standards, including IS 875 for gravity and wind loads and IS 1893 for seismic effects, are essential to ensure safety and serviceability. Overall, the literature establishes that Mivan aluminium formwork is particularly suitable for large-scale, repetitive, and schedule-sensitive residential construction. Further research involving detailed ETABS based comparative analysis, life-cycle cost assessment, sustainability evaluation, and nonlinear seismic performance of Mivan structures would provide a more comprehensive understanding of its long-term structural and economic benefits.
References
[1] Anagha M and Anoop P P, “Earthquake Response of Different Shapes of Tall Vertically Irregular Mivan Wall Building”, International Journal of Engineering Research & Technology (IJERT), ISSN: 2278-0181, Vol. 5 Issue 08, August-2016.
[2] Bidare Abhijit V, Bhagaje Deepali, “Comparative Analysis of Conventional Technology and Mivan Technology”, International Research Journal of Engineering and Technology (IRJET), Volume: 08 Issue: 09 | Sep 2021.
[3] Bhanulatha G.N., Reddy M. Sreenivasulu and Dr. Reddy Y. Ramalinga, “Study of Dynamic Behaviour of MIVAN Structure with Different Percentage of Openings and Different Seismic Zones”, International Journal of Advances in Scientific Research and Engineering (IJASRE), Vol.3 (9) Oct - 2017.
[4] Choubey Anuj, Maru Savita “Optimum Shape for High Rise MIVAN and Conventional Structure in Seismic Loading” (IJRTE) Volume-8 Issue-5, January 2020.
[5] Chauhan Hemendrasinh, Dr. Parikh K B “Comparison and Effectiveness of Mivan formwork Over the Conventional formwork”, December 2017, Volume 4, Issue 12 Journal of Emerging Technologies and Innovative Research (JETIR) (ISSN-2349-5162).
[6] Ganar, A. S., & Patil, S. D. (2015), “Comparative analysis on cost and duration of MIVAN formwork building and Conventional Formwork building”, International Journal on Recent and Innovation Trends in Computing and Communication (IJRITCC), 3(12), 6472–6474.
[7] Hinduja Anmol, Sankle Tarun, Ahmed Mahroof, “Comparative Study of Mivan Technology and Conventional RCC Structures in High Seismic Zones”, International Journal for Research in Applied Science & Engineering Technology (IJRASET) Volume 13 Issue VI June 2025 ISSN: 2321-9653.
[8] Jangid Yogesh Radheshyam, Khan Ahtisham Mohd Shamim, Mohite Gaurav Kashinath, Narvekar Abhishek Ashok, Prof. Khultej Gurav, “Mivan Formwork in Construction”, International Research Journal of Engineering and Technology (IRJET) Volume: 10 Issue: 04 | Apr 2023.
[9] Kote Aarti Nanasaheb, Nandeshwar Aahuti Ramesh, “Duration Comparison of Mivan Formwork over the Conventional Formwork”, International Journal Engineering Application for & Research in Management (IJREAM) ISSN: 2454-9150, 2020.
[10] Kushwaha Jatin, Kumar Nirmal Pradeep, Singh Lokesh “Analysis of a Tall Structure Considering Mivan Technology Under Lateral Load Using ETABS - A Review”, 2022 International Journal of Scientific Research in Civil Engineering | IJSRCE | Volume 6 | Issue 5 | ISSN: 2456-6667.
[11] ] Mahale Vedika Prasad, Waghmare Aditi Sanjay, Prof. Khan M S [2024] “Optimizing Construction Efficiency with Mivan Formwork System”, IJCRT | Volume 12, Issue 3 March 2024 | ISSN: 2320-2882.
[12] M S Hemanthkumar and T Kiran., “Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildings by Using Gust Factor Method”, International Research Journal of Engineering and Technology (IRJET), Volume: 04 Issue: 09 | Sep -2017.
[13] Mr. Thote, Nikhil S., Prof. Deshmukh Aditi .H [2022] “Analysis of Framed Structure vs Mivan Structure” IRJMETS Volume: 04 Issue:01 January-2022 e-ISSN: 2582-5208.
[14] Nisarga K, Madhukaran, “Structural Performance of Mivan Structural System Over Conventional Structural System”, International Journal of Scientific Research and Modern Technology (IJSRMT) Volume 1 Issue 1 2022.
[15] Patekar, N. B., & Shaikh, A. F. (2023),” Assessing the impact of conventional formwork and Mivan formwork on construction productivity and efficiency”, World Journal of Advanced Engineering Technology and Sciences, 9(1), 240–247. DOI: 10.30574/wjaets.2023.9.1.0168.
[16] Patil Anantkumar M, Awati Vishwanath, J. V. Rashmi “Comparative Analysis of Conventional Formwork and Mivan Formwork based on Duration and Cost”, International Research Journal of Engineering and Technology (IRJET) Volume: 07 Issue: 06 | June 2020.
[17] Prajwal M L, Dr Murthy M Keshava, “Comparative Seismic Analysis of Multistorey Mivan Structures Over Conventionl RC Structures”, Journal of Emerging Technologies and Innovative Research (JETIR) July 2025, Volume 12, Issue 7 ISSN-2349-5162.
[18] Prathul U, Pammar Leeladhar “Analysis of Productivity by Comparing Mivan and Conventional Formwork”, Journal of Emerging Technologies and Innovative Research (JETIR) April 2015, Volume 2, Issue 4 (ISSN-2349- 5162).
[19] Prof. Mrs. Ziradkar Poorva, Mr. Shinde Ajinkya, Mr. Shamsuddhin Momin Ayyaj, Mr. Pawar Shravan, Mr. Rashid Momin Shayan, “Use of Mivan Formwork in RCC G+12 Building”, International Journal of Advance Research in Science, Communication and Technology (IJARSCT) Volume 5, Issue 6, April 2025.
[20] Ramteke Pratik Prakash, Dhoke Rachana, Gurpude Samiksha, Sarote Arshad, Prof. Sharma Jahesh Sharma “To Analyzed the Building by Mivan Technology”, International Research Journal of Modernization in Engineering Technology and Science (IRJMETS) Volume:04/Issue:04/April-2022.
[21] Sajeet. S. B, Gowda Supreeth S, “Earthquake Response of different shapes of Mivan wall Tall Buildings”, International Journal of Research in Engineering and Technology (IJRET), Volume: 04 Issue: 10 | Oct 2015.
[22] Sreenath. V, B. Prakash Rao, Anup Wilfred Sebastian, Chengappa K.K “Suitability of Modular Aluminium formwork in RCC framed Structures”, IJCIET Volume 9, Issue 6, June 2018 ISSN Online: 0976-6316.
[23] Walvekar Pawan M, Sonawadekar Hemant L, “Seismic Performance Evaluation of Mivan Structural System v/s Conventional Structural System with Effect of SSI by Pushover Analysis”, International Research Journal of Engineering and Technology (IRJET), Volume: 04 Issue: 06 | June -2017.
[24] Wijesekara D.M., “Cost Effective and Speedy Construction for High-Rise Buildings in Sri Lanka by Using Aluminium Panel System Formworks”, ACEPS 2012, pp. 239–244.